
A hotel event and a farm outage need different units and return times. Keep the chosen generator booked through collection and fuel check.
Book the actual unit
Publish portable generator or larger site generator separately so the hirer cannot reserve the wrong unit or span.
Learn moreThe real occupied span
The fleet view follows the complete generator hire through the fuel and condition check rather than reopening at the nominal event finish.
Learn moreThey know there is a wedding in a field, or a site with three-phase welding gear. The rating is a calculation at your end, and both ways of getting it wrong are yours to own.
The set is chosen by what it actually has to run, so nobody arrives at a field with a machine that trips out during the speeches.
A set on site for a fortnight has to be refuelled, and those are jobs in your week rather than a single line that ends at collection.
A hired set leaves the page from delivery to collection, so a machine sitting in a compound is never promised to a second job.
Built for your yard
Reserve the unit through yard preparation, Eircode delivery, event time and collection.
Keep every booked day and the fuel check on the chosen generator’s diary.
Retain the operator’s equipment note, Eircode and chosen generator on the booking.
The building-site power hire: hold the generator after hand-back for cleaning and inspection before the next handover.
A hotel-event generator: public booking captures one Eircode; staff add later delivery or return details to notes.
A farm outage needs a portable unit: repeat this job on one chosen weekday weekly or fortnightly, ending with the arrangement.
The building-site power hire: keep both alternatives on the quote, letting the organiser approve the suitable service lines online.
A hotel-event generator: record the offline receipt and leave the remaining amount visible without creating a card transaction.
A farm outage needs a portable unit: keep the return note on the booking and extend unavailable time when inspection prevents the next turnaround.
The building-site power hire: if the booking cancels, release only that unit’s interval; neighbouring hires remain where they were.
The complete generator hire occupies the selected generator through the fuel and condition check, with first address and contact ready.
Rating, fuel type and the dates in one go, so what arrives on site is the machine that was actually agreed.
A hotel-event generator: the accepted quote and manually recorded bank transfer keep one amount visible while settlement remains offline.
A hotel-event generator: keep the accepted option, span and service lines attached when the approved document becomes a booking.
The building-site power hire: apply bank transfer or cash to the booking and leave staff a clear amount still to collect.
A farm outage needs a portable unit: the operator chooses whether to enable a confirmation or reminder after details are settled.
One app for every booking
A hired set leaves the page from delivery to collection, so the machine sitting in a field on the Saturday is not also promised elsewhere.
The set is chosen by what it actually has to run, so nobody is sent a machine that trips out under load or one three times bigger than needed.
For the portable generator booking, staff may switch on a timed email with the agreed collection or delivery details once the plan is confirmed.
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
Yes. A hotel-event generator: keep the selected generator closed from yard test and loading through the fuel and condition check, including the complete occupied interval.
No. The building-site power hire: collect one starting address; staff add later delivery or return detail to notes.
A farm outage needs a portable unit: post bank transfer manually to the booking. The receipt reduces the visible amount while settlement remains offline.
Yes. The building-site power hire: the organiser can approve a quote containing portable generator or larger site generator, then staff convert its accepted lines.
Yes. A farm outage needs a portable unit: repeat this job on one weekday weekly or fortnightly, ending on a date or after the agreed count.
A hotel-event generator: the exact span returns to that generator; other confirmed work does not move.