
The test lands the week the house is genuinely ready, the number goes out from the driveway, and a fail becomes a booked retest rather than a phone tree.
Online booking
Publish the test with the time it genuinely takes and the price you genuinely charge. A super takes Tuesday without three voicemails first.
Learn moreSmart scheduling
A frozen site slips by weeks, not days. Drag the test to when the house is ready and the builder hears, rather than you driving out for nothing.
Learn moreNothing is ready when it was meant to be. Drag the test onto the week the dwelling is genuinely finished and the record goes with it, instead of you finding out at the gate.
Take the retest before the fan is packed down, with the first number already attached. The comparison then lives on one record rather than in two separate files.
Built for your trade
The one the paperwork waits on, booked against the build rather than squeezed in as a favour on a Friday.
A fail is a second booking. Take it before the fan is packed away, with the first number already on the record.
Its own visit at its own price. Finding the gaps is real work and it is not the same job as measuring them.
Done while the walls are open, so a poor number costs a day of sealing rather than pulling board back off in February.
Several dwellings in a morning, each with its own record and its own number against the right unit.
Tested before the retrofit starts, so the owner can see what the air sealing genuinely bought them.
The urgent house goes today and the scheduled tests fill the rest of the week around it.
One builder, dozens of houses a year. Every test you have run for them sits under a single customer card.
The number, the conditions and the date, sent as the deliverable rather than typed into an email that night.
Paid by card up front, so a single test does not become two months of chasing one invoice.
Set out the honest options: chase the leaks with a smoke pencil, seal it and test again, or take the number as it stands.
Finding the gaps is not the same job as measuring them. Two lines stop a builder assuming the second one came free.
Nobody argues about a retest fee that was on the estimate before the first number came in. The conversation after a fail is what costs you.
The estimate goes from the phone at the curb, while the number is still what everyone on site is talking about.
A rush retest this week, a second house while the fan is already rigged, a written list of where it leaks instead of a bare number. Check one and the estimate moves with it. Options come with Pro.
A builder against an occupancy date calls the next tester on the list. When the diary is full the page says so and takes the job anyway.
The address, the lot numbers, how many units and when they are ready, together, so you can judge whether it is worth moving something.
What you told the super Monday is still on the record Friday, on whichever phone you happen to have with you.
Somebody else running late leaves a gap you fill from the same screen, and the confirmation email does the telling on your behalf.
Four units ready Thursday and handover is the week after. Any chance you can fit us in?
The repeat work is the business. Their sites, the tests already done and what is still outstanding sit on one card instead of in your head.
Claim the areas you cover and leave the rest off, so a single dwelling three hours out cannot quietly book itself into your Tuesday.
Open the schedule and see which houses are genuinely ready, who is testing where, and which builder needs a number before the date.
One house and a row of six are not the same morning. Give each its own duration and the day stops unravelling after the second stop.
The orientation, the lot number, the gate and who holds the key, beside the job rather than in a message thread from two weeks ago.
Put the test on the week the house is ready and the record goes with it. Turn the moment on and the super hears without you calling.
Draw schedules are slow enough already. Log the transfer by hand for nothing, or take the card before the fan leaves the truck.
Mark it paid when the money lands. Free on every plan, whether that is one house a week or a whole row.
Take a homeowner’s card at the door, or send a payment link before you are off the street. Either way the money is yours.
Part of it at the first round of tests, the rest at the retests. Staged requests are a Pro feature, once the test is on the schedule.
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
One app for the whole job
Yes. Publish it with its real length and price and they take a slot directly, which beats three voicemails and a message to settle on a day.
Drag the test to a later day and the record moves with it. Turn the moment on and the builder is told, instead of you finding out at the curb.
Yes, as a second booking against the same house. The first number stays attached, so both results sit on one record rather than in two files.
No. That comes out of your equipment and its own software. Bookables holds the booking, the customer, the estimate and the money around it.
No. Requirements differ province to province, whatever you hold is yours, and nothing here stores or checks it. It records the test you ran.
Yes. One tester with one fan fits inside the Free allowance and needs no card to begin. The plan cards below hold the current numbers.