
Test the house the week it is genuinely ready, get the result out from the driveway, and turn a fail into a booked retest instead of a fortnight of calls.
Online booking
Put the test up with the time it takes and the price you charge. A site manager takes a Wednesday without leaving three voicemails first.
Learn moreSmart scheduling
Houses are seldom ready early. Shift the test to the week it is and the builder hears about it, rather than you arriving to open doorways.
Learn moreNothing is ready when it was meant to be. Drag the test onto the week the dwelling is genuinely finished and the record goes with it, instead of you finding out at the gate.
Take the retest before the fan is packed down, with the first number already attached. The comparison then lives on one record rather than in two separate files.
Built for your trade
The one the rating waits on, booked against the build rather than squeezed in as a favour on a wet Friday.
A fail is a second booking. Take it before you pack the fan away, with the first result already on the record.
Its own visit at its own price. Hunting the gaps is real work and it is not the same job as measuring them.
Done while the walls are open, so a poor result costs a day of sealing instead of pulling a ceiling down later.
Several dwellings in one morning, each with its own record and its own result against the right house.
Tested before the work starts, so the owner can see what the sealing genuinely bought them afterwards.
The house where the number matters to somebody personally. Booked, tested and answered on the one record.
One builder, a scheme a year. Every test you have done for them sits under a single customer card.
The result, the conditions and the date, sent as the deliverable rather than typed into an email that night.
Paid by card up front, so a single test does not turn into two months of chasing one invoice.
Lay out the real choices: trace the leaks properly, seal it and test again, or take the result the way it stands.
Finding the gaps is not the same job as measuring them. Two lines stop a builder assuming the second one came free.
Nobody argues about a retest fee that was on the quote before the first result came in. The conversation after a fail is what costs you.
The quote goes from the phone at the gate, while the result is still what everyone on site is talking about.
A retest inside the week, a second house while the fan is already rigged, a written list of where it is leaking rather than a bare figure. Tick one and the total follows. Options come with Pro.
A builder against a date rings the next tester on the list. With nothing free the page says as much and still takes the house down.
The address, how many houses and when they are ready, all together, so you can judge whether it is worth moving something else.
What you told the site manager on Monday is still on the record on Friday, on whichever phone you happen to have with you.
Somebody else running late leaves a gap you fill from the same screen, and the confirmation email does the telling for you.
Four units ready Thursday and handover is the week after. Any chance you can fit us in?
The repeat work is the business. Their sites, the tests already done and what is still outstanding sit on one card instead of in your head.
Claim the areas you cover and leave the rest off, so a single dwelling three hours out cannot quietly book itself into your Tuesday.
Open the diary and see which houses are genuinely ready, who is testing where, and which builder needs a result before the assessment.
One house and a scheme of six are not the same morning. Give each its own duration and the day stops falling apart after the second site.
The induction, the house number, the gate and who holds the key, beside the job rather than in a thread from a fortnight back.
Put the test on the week the house is ready and the record goes with it. Turn the moment on and the builder hears without a phone call.
Payments on site are slow enough already. Record the transfer by hand for nothing, or take the card before the fan leaves the van.
Mark it paid when the money lands. Free on every plan, whether that is one house a week or a whole scheme.
Take a private client’s card at the door, or send a payment link before you are off the road. The money is yours.
Some at the first round of tests, the rest at the retests. Staged requests are a Pro feature, once the test is on the diary.
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
One app for the whole job
Yes. Publish it with its real length and price and a site manager takes a slot directly, which is quicker than three voicemails to settle on a day.
Move the test to a later day and the record travels with it. Turn the moment on and the builder is told, instead of you finding out at the gate.
Yes, as a second booking against the same house. The first result stays attached, so both sit on one record rather than in two separate files.
No. That comes out of your equipment and its own software. Bookables holds the booking, the customer, the quote and the money around it.
No. Whatever you are registered with is yours, and nothing here stores it, checks it or reminds you to renew. It records the test you carried out.
Yes. One tester and one fan sits comfortably inside the Free allowance, with no card up front. The plan cards below carry the numbers.