
The test sits on the day the build is actually ready, the result goes out from site, and a fail turns into a booked re-test rather than a phone call.
Online booking
Put the test on your page with a real length and a real price. A site manager can book Thursday at seven without three calls and a text thread.
Learn moreSmart scheduling
Lock-up is late more often than it is early. Drag the test to the following week and the builder is told, instead of you arriving to an open house.
Learn moreNothing is ready when it was meant to be. Drag the test onto the week the dwelling is genuinely finished and the record goes with it, instead of you finding out at the gate.
Take the retest before the fan is packed down, with the first number already attached. The comparison then lives on one record rather than in two separate files.
Built for your trade
The one that has to happen before anyone gets keys, booked against the programme rather than squeezed in on a favour.
A failed result is a second booking. Take it before you leave site with the first number already on the record.
Priced as its own visit, because finding the holes is real work and it is not the same job as measuring them.
Tested at lock-up while the walls are still open, so a bad number costs a day of sealing rather than a ceiling.
Six townhouses in a morning. Each dwelling gets its own record and its own number, on one visit.
An older house tested before the work starts, so the owner is buying an improvement they can actually see.
The urgent one goes today and the routine programme tests fill the rest of the week around it.
Same builder, thirty houses a year. Every test you have done for them sits under the one customer.
The number, the conditions and the date, sent as the deliverable it is rather than typed into an email that evening.
Paid up front by card so a single test does not turn into a month of chasing an invoice.
Price the honest options: a smoke-pencil hunt for the leaks, a seal-and-retest, or the number written up as it stands and handed to the certifier.
Measuring the leakage and going hunting for it are different jobs. Separate lines stop a builder assuming the second one was included.
Nobody argues about a re-test fee that was on the quote before the first result came in. It is the argument after the fail that costs you.
The quote goes from the phone at the gate while the number is still the thing everyone is talking about.
A same-week re-test, an extra dwelling on the same site while the fan is set up, a written list of where it leaks rather than a bare number. Tick one and the quoted total follows. Priced options come with Pro.
A builder facing a deadline will ring the next tester on the list. When the diary is full the page says so and still takes the job.
The address, the lot numbers, how many dwellings and when the site is at lock-up, in one place, so you can judge whether it is worth moving something.
What you told the site manager on Monday is still on the record on Friday, whichever phone you happen to be holding.
A build that slips leaves a gap you fill from the same screen, and the confirmation email does the telling for you.
Four units ready Thursday and handover is the week after. Any chance you can fit us in?
The repeat work is the business. Their sites, the tests already done and what is still outstanding sit on one card instead of in your head.
Claim the areas you cover and leave the rest off, so a single dwelling three hours out cannot quietly book itself into your Tuesday.
Open the diary and see which sites are genuinely at lock-up, who is testing what, and which builder needs a number before Friday.
A single dwelling and a block of six are not the same morning. Give each its own length and the day stops collapsing after the second site.
Gate code, the site induction, which lot number and who has the key, beside the job rather than in a text thread from a fortnight ago.
Move the test to the week it is actually ready and the record follows. Turn the moment on and the site manager hears without you ringing.
Progress claims are slow enough already. Record a transfer by hand for nothing, or take the card before you set the fan up.
Mark it paid when the builder’s payment lands. No charge for that on any plan, however many sites you run in a week.
Take an owner-builder’s card on the doorstep, or send a payment link before you drive off. The money is yours.
Some of it at the first test, the rest at the re-tests. Staged requests are a Pro feature, once the test is on the diary.
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
One app for the whole job
Yes. Publish the test with its real length and price and a site manager books a slot directly, which is usually faster than agreeing a day over three phone calls.
Drag the test onto a later day and the record moves with it. Switch the moment on and the builder is told, rather than you finding out at the gate.
Yes. Take it as a second booking against the same dwelling. The first result stays attached, so the comparison sits on one record rather than in two separate files.
No. The certificate comes out of your test equipment and its own software. Bookables holds the booking, the customer, the quote and the money around it.
No. Whatever you are accredited under is yours, and nothing here checks it, stores it or reminds you to renew. It records the test you carried out.
Yes. A tester doing a handful of jobs a week fits inside the Free allowance without a card on file. The plan cards below carry the numbers.