
Book the test for the week the house is genuinely closed in, get the number out from the driveway, and turn a fail into a booked re-test.
Online booking
Publish the test with the time it actually takes and the price you actually charge. A site manager picks Thursday without a chain of voicemails.
Learn moreSmart scheduling
Builds run behind. Shift the test to the week it is ready and the builder is told, rather than you driving out to a house with no doors on.
Learn moreNothing is ready when it was meant to be. Drag the test onto the week the dwelling is genuinely finished and the record goes with it, instead of you finding out at the gate.
Take the retest before the fan is packed down, with the first number already attached. The comparison then lives on one record rather than in two separate files.
Built for your trade
The one everything else waits on, sitting on the diary against the build rather than squeezed in as a favour.
A fail is a second booking, taken before you pack the fan away with the first number already attached.
A separate visit at its own price, because hunting the gaps is real work and measuring them is not the same job.
Done at closed-in, so a poor number costs a day of sealing instead of pulling a lining off later.
Several dwellings in one morning, each with its own record and its own number against the right unit.
An old weatherboard tested before the work starts, so the owner can see what they actually bought.
The house where the number matters to somebody personally. Booked, tested and answered on one record.
One building company, dozens of houses a year. Every test you have done for them sits under the one customer.
The number, the conditions and the date, sent as the deliverable rather than typed into an email that night.
Paid by card up front, so a single test does not become six weeks of chasing one invoice.
Give them real options: hunt the leaks with a smoke pencil, seal it and test again, or take the number as it stands.
Finding the gaps is not the same job as measuring them. Two lines stop a builder assuming the second one came free.
Nobody argues about a re-test fee that was on the quote before the first number came in. The argument after a fail is what costs you.
The quote goes from the phone at the gate, while the number is still what everyone on site is talking about.
A re-test inside the week, a second dwelling while the fan is already rigged, a written list of where it leaks. Tick one and the total follows. Options come with Pro.
A builder against a deadline rings the next tester on the list. When there is nothing left the page says as much and takes it regardless.
The address, the lot numbers, how many dwellings and when it is closed in, together, so you can judge whether to move something.
What you told the site manager on Monday is still there on Friday, whichever phone you happen to have on you.
Somebody else running late leaves a gap you fill from the same screen, and the confirmation does the telling for you.
Four units ready Thursday and handover is the week after. Any chance you can fit us in?
The repeat work is the business. Their sites, the tests already done and what is still outstanding sit on one card instead of in your head.
Claim the areas you cover and leave the rest off, so a single dwelling three hours out cannot quietly book itself into your Tuesday.
Open the diary and see which sites are genuinely closed in, who is testing where, and which builder needs a number before the inspection.
One house and a row of six are not the same morning. Give each its own length and the day stops falling apart after the second site.
The induction, the lot number, the gate and who has the key, beside the job instead of in a thread from a fortnight ago.
Put the test on the week it is actually ready and the record goes with it. Turn the moment on and the site manager hears without a call.
Progress claims are slow enough. Record the transfer by hand for nothing, or take the card before the fan comes out of the van.
Mark it paid when the money shows up. Free on every plan, whether you test one house a week or twenty.
Take a private owner’s card at the door, or send a link before you are down the drive. The money is yours.
Some at the first round of tests, the rest at the re-tests. Staged requests need Pro, and only once the test is on the diary.
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
One app for the whole job
Yes. Publish it with its real length and price and a site manager takes a slot directly, which beats three voicemails and a text to settle on a Thursday.
Move the test to a later day and the record travels with it. Turn the moment on and the builder is told, instead of you discovering it at the gate.
Yes, as a second booking against the same dwelling. The first number stays attached, so both results sit on one record rather than in two files.
No. That comes out of your gauge and its own software. Bookables holds the booking, the customer, the quote and the money that sit around it.
No. Whatever you hold is yours, and nothing here stores it, checks it or reminds you about renewing. It records the test you carried out.
Yes. One person and a fan will sit well inside the Free allowance, with no card needed. The plan cards below carry the numbers.