
The plot is tested the week it is genuinely ready, the figure goes out from site, and a fail becomes a booked retest rather than a fortnight of calls.
Online booking
Publish the test with the time it genuinely takes and the price you genuinely charge. A site manager takes a Tuesday without a chain of voicemails.
Learn moreSmart scheduling
Plots are rarely early. Move the test to the week the plot is ready and the site is told, rather than you arriving to find no doors hung.
Learn moreNothing is ready when it was meant to be. Drag the test onto the week the dwelling is genuinely finished and the record goes with it, instead of you finding out at the gate.
Take the retest before the fan is packed down, with the first number already attached. The comparison then lives on one record rather than in two separate files.
Built for your trade
The one the handover waits on, sitting against the programme rather than squeezed in as a favour on a Friday.
A fail is a second booking. Take it before the fan is packed down, with the first figure already on the record.
Its own visit at its own price, because finding the gaps is real work and measuring them is a different job.
Tested before the linings go on, so a poor figure costs a day of sealing rather than pulling plasterboard off.
Several dwellings in one visit, each with its own record and its own figure against the right plot number.
An old house tested before the work starts, so the owner can see what the sealing actually bought them.
The urgent plot goes today and the programmed tests fill the rest of the week around it.
One housebuilder, several sites a year. Every test you have done for them sits under a single customer.
The figure, the conditions and the date, sent as the deliverable rather than typed into an email that evening.
Paid by card up front, so a single test does not become two months of chasing one invoice.
Give them the honest choices: trace the leakage properly, seal it and test again, or take the figure as it stands.
Finding the gaps is not the same job as measuring them. Two lines stop a developer assuming the second came free with the first.
Nobody argues about a retest fee that was on the quote before the first figure came in. It is the conversation after a fail that costs you.
The quote goes from the phone at the gate, while the figure is still the thing everyone on site is talking about.
A retest inside the week, a second plot while the fan is already rigged, a written schedule of where it is leaking rather than a bare figure. Tick one and the total follows. Priced options come with Pro.
A developer against a date rings the next tester on the list. With nothing free the page says so and takes the plot down anyway.
The address, the plot numbers, how many dwellings and when they are ready, together, so you can judge whether it is worth moving something.
What you told the site manager on Monday is still on the record on Friday, on whichever phone you happen to be holding.
Somebody else running late leaves a gap you fill from the same screen, and the confirmation email does the telling on your behalf.
Four units ready Thursday and handover is the week after. Any chance you can fit us in?
The repeat work is the business. Their sites, the tests already done and what is still outstanding sit on one card instead of in your head.
Claim the areas you cover and leave the rest off, so a single dwelling three hours out cannot quietly book itself into your Tuesday.
Open the diary and see which plots are genuinely ready, who is testing where, and which developer needs a figure before completion.
One plot and a terrace of six are not the same morning. Give each its own duration and the day stops unravelling after the second site.
The induction, the plot number, the compound gate and who holds the key, beside the job rather than in a thread from a fortnight ago.
Put the test on the week the plot is ready and the record follows. Switch the moment on and the site manager hears without a call.
Valuations are slow enough already. Record the transfer by hand for nothing, or take the card before the fan leaves the van.
Mark it paid when the money arrives. Free on every plan, whether that is one plot a week or a whole site.
Take a private client’s card at the door, or send a payment link before you have left the street. The money is yours.
Some at the first round of tests, the remainder at the retests. Staged requests are a Pro feature, once the plot is on the diary.
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
One app for the whole job
Yes. Publish it with its real length and price and they take a slot directly, which is rather quicker than three voicemails to settle on a Tuesday.
Move the test to a later day and the record travels with it. Switch the moment on and the site is told, instead of you finding out at the hoarding.
Yes, as a second booking against the same plot. The first figure stays attached, so both results sit on one record rather than in two separate files.
No. That comes from your equipment and its own software. Bookables holds the booking, the customer, the quote and the money around it.
No. Whatever scheme you are signed up to is yours, and nothing here stores it, checks it or reminds you to renew. It records the test you carried out.
Yes. A sole trader testing a few plots a week stays inside the Free allowance, no card required. The numbers are on the plan cards below.