
A festival unit and a construction generator leave the yard differently. Track delivery, hire and the fuel check on the actual machine.
A clearer first request
The larger site generator request reaches staff with the item, first postcode and requested interval already attached.
Learn moreInventory on a timeline
Reserve the complete generator hire as one interval so preparation and the fuel and condition check do not leak online.
Learn moreThey know there is a wedding in a field, or a site with three-phase welding gear. The rating is a calculation at your end, and both ways of getting it wrong are yours to own.
The set is chosen by what it actually has to run, so nobody arrives at a field with a machine that trips out during the speeches.
A set on site for a fortnight has to be refuelled, and those are jobs in your week rather than a single line that ends at collection.
A hired set leaves the page from delivery to collection, so a machine sitting in a compound is never promised to a second job.
Built for your yard
Hold the selected unit from yard test through site delivery and the fuel check on return.
Keep setup and collection road time around the event, with the selected generator held until yard return.
Quote portable and larger site generators separately with agreed service lines.
The outdoor festival unit: hold the generator after hand-back for cleaning and inspection before the next handover.
A construction-site generator: public booking captures one postcode; staff add later delivery or return details to notes.
Temporary power for a workshop: repeat this job on one chosen weekday weekly or fortnightly, ending with the arrangement.
The outdoor festival unit: keep both alternatives on the quote, letting the organiser approve the suitable service lines online.
A construction-site generator: record the offline receipt and leave the remaining amount visible without creating a card transaction.
Temporary power for a workshop: keep the return note on the booking and extend unavailable time when inspection prevents the next turnaround.
The outdoor festival unit: if the booking cancels, release only that unit’s interval; neighbouring hires remain where they were.
The complete generator hire occupies the selected generator through the fuel and condition check, with first address and contact ready.
Rating, fuel type and the dates in one go, so what arrives on site is the machine that was actually agreed.
A construction-site generator: the accepted quote and manually recorded BACS receipt keep one amount visible while settlement remains offline.
A construction-site generator: keep the accepted option, span and service lines attached when the approved document becomes a booking.
The outdoor festival unit: apply BACS receipt or cash to the booking and leave staff a clear amount still to collect.
Temporary power for a workshop: the operator chooses whether to enable a confirmation or reminder after details are settled.
One app for every booking
A hired set leaves the page from delivery to collection, so the machine sitting in a field on the Saturday is not also promised elsewhere.
The set is chosen by what it actually has to run, so nobody is sent a machine that trips out under load or one three times bigger than needed.
Enable the email reminder when the portable generator booking needs one, rather than assuming every hire should send the same message automatically.
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
Yes. A construction-site generator: keep the selected generator closed from yard test and loading through the fuel and condition check, including the complete occupied interval.
No. The outdoor festival unit: collect one starting address; staff add later delivery or return detail to notes.
Temporary power for a workshop: post BACS receipt manually to the booking. The receipt reduces the visible amount while settlement remains offline.
Yes. The outdoor festival unit: the organiser can approve a quote containing portable generator or larger site generator, then staff convert its accepted lines.
Yes. Temporary power for a workshop: repeat this job on one weekday weekly or fortnightly, ending on a date or after the agreed count.
A construction-site generator: the exact span returns to that generator; other confirmed work does not move.