
Price the elevation off a measure instead of a phone photo, keep the quote alive while the owner talks to the bank, and block the house out from delivery to the last flashing.
Online booking
Owners pick a site measure time off your real diary. The strip-and-reclad comes through as a quote request, because nobody prices a wall off a photo.
Learn moreSmart scheduling
A re-clad is six days of open wall, not a visit. Block the run from the delivery to the last flashing, and shift the lot when the weather turns.
Learn moreThree ways to price one elevation: patch and repaint the boards there now, overlay in Hebel ready for render, or strip to frame and hang fibre cement.
Board area, strip-out and flashing runs are separate lines, so when the owner queries the number you can show them which part it came from.
They accept and sign where they are standing, and the accepted quote turns itself into a booked run rather than a note to call back.
The quote goes from the phone in the driveway, which is usually before the next mob has rung the owner back.
Corner trims, a colour upgrade, sarking, painted soffits. Each one moves the quoted total the moment the owner ticks it, so you are not rebuilding the same quote a third time.
Cladding fills months ahead and the good jobs ring anyway. When the diary has nothing left, the page takes the enquiry instead of losing it.
Address, wall and what they are after, sitting in your inbox as a job waiting on a date rather than a missed call.
The message, the photos of the eaves and the quote all live on the one job instead of across a phone and an email account.
A delivery slips and a week opens. Give them the date from inside the thread and the job is booked in the same breath.
The back wall of the house in Newtown is past patching. What would the whole elevation look like, and when could you start?
Built for your trade
Priced by wall area with the strip-out and the tip runs on their own lines, so the owner sees what the removal costs before they commit to it.
A half-day job that turns into four when you open it up. Quote the boards you can see, and add the rest as options the owner can accept from the driveway.
Panel, adhesive and the renderer coming in behind you are separate lines, so the owner can read where their money is going before the scaffold is up.
Booked as a run of days against the builder rather than a slot, and moved as one block when the frame is not ready on the Monday you were promised.
A two-day job priced by the sheet run, booked straight from the measure while you are still standing at the wall.
The strata committee takes months to decide. Set an expiry so the price they finally accept is not the one you quoted two winters ago.
Small, high-margin and always an add-on. Quote it beside the main elevation as an option, priced per run rather than buried in one number.
The bit the painter finds. Book it as its own short job on a house you have already worked, with the previous run sitting on the same customer card.
Books as an inspection first, because nothing gets priced until somebody is up the ladder looking at what the wind actually took.
Sold on the day the wall is open and never any other day. Add it to the live quote as an option instead of writing a second one.
A site measure carries a price and a slot, so it fills your diary while you are up a ladder. The elevation itself waits for a tape, and the page is honest about that.
A whole-wall number waits on a bank, an insurer or a committee. See which quotes were opened and which went quiet, so the one worth a call is obvious.
The house is open to the weather from the strip-out until the boards are closed up, so it is booked as the week it is rather than as an hour on a Tuesday.
This work is sold to a building, not to a person. The last elevation you did, what it came to and the soffits after it, all on the one record.
You cannot hang boards on a wet frame. Drag the run to next week and everyone hears about it without you making six phone calls.
Move the whole block on the timeline and the dates update where the customer reads them.
Moving your own work around your own week costs nothing. That is the diary, not an upgrade.
On the way, on site, done. The owner living in a house with an open wall gets told without ringing you.
A week on site and a truck of sheets has a sensible radius, and past it the job stops paying. Set what you cover and the page holds the line.
Draw the area, set a radius from the yard, or list the postcodes. Outside it, no measure times are offered at all.
If one crew works the east and one the north, each keeps its own area and the jobs fall to the right one.
Inside your area the price is the price. Nothing is quietly added for a longer drive.
A re-clad is a lot of money in stages. Record cash and transfers by hand for nothing, or send a card link on Pro.
Mark the job paid when the transfer lands. That costs nothing on any plan and always will.
Send a link the day the scaffold comes down instead of posting an invoice and waiting on the mail.
Part when the boards land, the rest at sign-off. Staged requests come with Pro and go out after the job is booked.
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
One app for the whole job
Yes. Your page offers measure times from your real availability, and only to addresses inside the area you cover, drawn on a map, set as a radius or listed by postcode. The re-clad itself comes through as a quote request, not a booked slot.
Build one quote with the tiers you actually offer, repair and repaint, overlay, or full strip and re-clad, plus extras like trims and sarking as priced options. The owner picks, signs on their phone, and the accepted quote becomes a booked job. Priced options come with Pro.
Put an expiry date on the quote. Board and freight pricing moves, and an expiry means last spring’s number is not held against you in October. The customer also gets a reason to decide.
Yes. A cladding job is booked as the run it is rather than a one-hour slot, and you drag the whole block to the following week when rain stops you hanging boards. Moving your own work costs nothing on any plan.
You can send a payment request once the job is booked, so part lands when the boards arrive and the rest at sign-off. Card payments come with Pro. Cash and bank transfer you record by hand cost nothing on any plan.
Yes. Invite your installers, give each one a role with the right permissions, and set individual weekly hours plus date overrides for rain days and RDOs.
Compare online and phone bookings for service businesses, with a practical way to handle standard jobs, tricky enquiries and customers who prefer a call.
ReadHandle enquiries when your diary is full with clear requests, alternative times and a practical manual waiting list that avoids double bookings.
ReadChoose booking deposits that fit your work, explain the balance and cancellation terms, and understand how deposits differ from refundable security bonds.
Read