
One place for the measure-up, the quote, the install days and the money, from the first phone call about worn carpet to the last bead of scotia.
Online booking
Put the measure-up online and let people pick a slot. They tell you the rooms and the floor going in, so the van gets the sander or the tile cutter.
Learn moreSmart scheduling
A screed that has to cure is not a gap in the diary. Block the drying days as their own job so nobody lays where the smoothing compound is still wet.
Learn moreThe job every flooring business quotes most, and the one where the customer wants the cheap end and the good end laid out rather than explained.
Pro adds option groups with their own price deltas, so a heavier underlay, moving the furniture out and back, and taking the old carpet away each move the number the customer is looking at.
Enter the square metres and the number comes out, instead of doing sums on the back of a docket in the driveway.
Carpet, hybrid and timber priced side by side, so the choice is theirs to make rather than yours to explain twice.
Underlay grade, uplift and disposal, furniture moving. Each one shows what it adds, so nothing turns up as a surprise later.
You lift the old vinyl and find a floor that needs levelling before anything goes down. The rest of the week has to move.
Move the afternoon job to Thursday on the calendar and it is done. No plan needed for that.
Message them from the same job record, so what you told them sits with the booking rather than in your phone.
The days behind it shift with it, so you are not the only one holding the real running order in your head.
The measure, the levelling visit with the days it needs to dry, the laying and the money that followed it. Kept together at the address, so when they ring about a lifted board three years on you are reading it back rather than remembering it.
Built for your trade
Priced on the floor area off the measure-up, with the stairs and landing as their own line so nobody argues about it on the day.
Two visits on the calendar: the moisture test on the slab, then the laying days once the reading comes back where it needs to be.
Booked as consecutive days with the coats between them, because the customer cannot walk on it and needs telling that up front.
Quoted by area, scheduled for a weekend when the floor is empty, and priced with the lift-and-relay of the desks as an option.
A short sheet-vinyl job with coved skirting as an option, slotted into the afternoon after a bigger install finishes.
Sold by the flight rather than the metre, with the nosings and rods as options so the quote matches what they actually chose.
A one-day install the agent books online between tenants, with the uplift of the old carpet ticked on because it always is.
Welded sheet with coving, quoted by area and booked out of hours so the practice is open again the next morning.
The strip-out, the drying gap and the relay booked as separate visits, so the loss adjuster can see what happens when.
A single day of screen and recoat instead of a full sand, quoted off the area and sold as the cheaper of two answers.
Its own visit with its own drying time, kept off the laying day so the crew never turns up to a floor that is still soft.
A living room in laminate or hybrid is the same job every time, so it can carry its own price and land in the gap on its own. The whole-house work still starts with a measure-up, because nobody prices four rooms and a stair flight off a phone call.
Every measure ends in a document, and the ones that go quiet all look identical from your side. Seeing which was read this morning and which was never opened is the difference between a follow-up and a nuisance.
Flooring runs in waves and the good months fill up. A page with nothing on it sends people to the next fitter; one that says when you are free keeps them.
They see the first day you can actually lay, which is honest and usually sooner than they feared.
If nothing suits, they leave the rooms and the floor they want and you ring back when a job falls through.
The calendar only offers what is genuinely free, so you never turn up to a house two crews were sent to.
Lounge, hall and two bedrooms, and the stairs if you do them. Old carpet needs taking away. How far out are you?
The jobs that hurt are the ones an hour past where you meant to stop. Draw the line once and the booking page holds it.
A postcode you do not cover cannot book itself in. It asks, and you say yes or no with the diary in front of you.
The commercial fitter covers the city, the domestic pair covers the outer suburbs, and neither ends up on the wrong job.
The area decides whether you go, not what you charge. A longer drive is a decision, not a line on the quote.
Most flooring balances land as a transfer the night you finish. That has always been free here, and cards are there for the ones who want to tap.
Record what landed and the job is closed. No plan needed, no percentage taken off a job you already did.
For the customer standing in a bare hallway with a phone, wanting it settled before you drive away.
Ask for the materials money once the job is booked and the balance when the last trim goes on.
One app for the whole job
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
Yes. Floor area is one of the pricing drivers, so a quote for 82 square metres of hybrid plank prices itself the moment you enter the measure. Rooms work the same way if you sell stair-and-landing carpet by the room instead.
As an option on the service, with its own price on top. Tick it when the customer wants the old carpet and underlay taken away, leave it off when the builder is skipping it, and the quote moves accordingly.
Book the test as its own short visit and the install days after it. AS 1884:2021 covers what you do about the subfloor before resilient sheet and tiles go down, and having the test on the calendar is how you stop a laying crew arriving too early.
They are separate services with their own durations and options, so a sand-and-seal on spotted gum can run three days with a coat between while a carpet install runs a single day. Carpet, the textile work AS 2455.1 covers, and a timber floor never want the same slot length.
Yes. Add him to the team, give him the services he does, and his install days sit on the same calendar as yours. You can see both without ringing him from the ute at seven in the morning.
Cash and bank transfer you record yourself are free on any plan, which is how most flooring balances land. Card payments come with Pro if you would rather they tapped before you loaded the trims back in the van.
Compare online and phone bookings for service businesses, with a practical way to handle standard jobs, tricky enquiries and customers who prefer a call.
ReadHandle enquiries when your diary is full with clear requests, alternative times and a practical manual waiting list that avoids double bookings.
ReadChoose booking deposits that fit your work, explain the balance and cancellation terms, and understand how deposits differ from refundable security bonds.
Read