• Pricing
An excavator taking down a detached garage in Canada

Demolition software for Canadian contractors.

Your walk-through books itself, the scope is in writing before you mobilize, and the demo, the bins and the site clean-up all live on the one job.

Try it
or
Start with Google
200 bookings a month, free. No credit card required.
  • Site inspections booked against real availability
  • Quotes signed online before you mobilise
  • Deposits taken through Stripe at acceptance
  • Team timeline shows which crew is on which site
  • A full diary never costs you the lead

Online booking

Basement guts book. Teardowns get walked.

A kitchen tear-out already carries a price, so it takes a real slot. A whole-house teardown arrives as a request you walk before you price.

Learn more
A bathroom strip-out priced instantly from the job details.
New bookingAvailable
ServiceBathroom strip-out
WhereGround floor · The Beaches
DateWed 20 Aug · 8:00am
Priced instantly$780

Smart scheduling

The demo date moves, and everyone knows.

The utility disconnect slipped, so Monday becomes Thursday. Drag the job and your homeowner and your crew both get the new date automatically.

Learn more
bookables.ai/schedule
A day on the schedule's calendar, with three jobs placed on a vertical time grid at the times they run.
Wednesday1 Jul
3 jobs
08:00
09:00
10:00
11:00
12:00
13:00
14:00
08:00 · Leslieville
Site inspection
10:00 · The Beaches
Garage demolition
12:30 · Roncesvalles
Kitchen strip-out

Booked into fall, and the job still lands.

Demo books out weeks ahead and your customer has a closing date. With no slot to offer, your page takes the request and the week the lot has to be clear.

  • They ask instead of leaving

    The request lands in your inbox with the address, what is coming down and the date the lot has to be clear.

  • The photos come with it

    Homeowners send pictures of the garage and the siding right from their phone, so you know what you are walking into before you drive out.

  • Everything said stays on the job

    Every message from the first request through to the estimate sits on the record, so nobody is guessing in March what was agreed in July.

A booking request inside a message thread, answered with accept or decline without leaving the conversation.
ÉTÉmilie Tremblay

Garage and the old slab in The Beaches have to be gone before settlement. Anything in the next three weeks?

Booking request
Site walk, then quote
Tue 19 Aug · 7:00am · The Beaches
AcceptDecline

A detached garage, priced three ways.

The job every demo contractor quotes most weeks: take it down and leave the slab, take it down and haul it away, or that plus grading the pad after.

  • Priced on what stays, not just what goes

    The retaining wall, the driveway and your neighbour’s fence go on the estimate as staying, so the conversation six weeks later is a document rather than a memory.

  • Tipping is a line, not a surprise

    Bins and tipping sit right beside the machine and the operator, so your customer sees what the waste costs before they say go.

  • Sent from the curb, not the office

    Your scope goes out while you are still parked out front, which is usually before the second contractor has called them back.

  • Extras priced as options · Pro

    Siding handled before the machine starts, the slab out with the walls, one more bin for the concrete. Each is a priced line your customer checks, and the total moves with it.

A detached garage demolition quote, itemised and ready to send.
Estimate #1042
Émilie Tremblay
Sent
  • Excavator & operator1 day$1,850
  • Bin hire & tipping feesDisposal$1,240
  • Site clear & make good4 hrs$560
Total$3,650
Three crew members on one timeline, each with their jobs laid out across the working day so gaps are easy to spot.
TeamWednesday 1 Jul
3 on today
08:0010:0012:0014:0016:00
PSPriya
ValeRoweKerr
JWJacob
BevanHartNair
CBChloé
ShawOduya

Two machines, three sites, one week.

Who is on the strip-out, who is on the knockdown and who is loading bins, on one timeline. When a job runs into a second day, you can see what it pushes before you promise anyone a morning.

Built for your trade

Built for the jobs you actually take down

Basement gut before a rebuild

Priced room by room, with drywall, framing and the haul-away as their own lines so nobody argues later about what filled the bins.

Kitchen and bath tear-out

The job your renovators call you for every month. Give it a set price and the next one books a real slot while you are still running a machine.

Detached garage teardown

Walked, scoped and quoted three ways: slab stays, slab goes, or slab goes and the pad gets graded. Your customer checks a box and the total follows.

Above-ground pool removal and backfill

Break-out, fill and compaction are separate lines, because homeowners always ask what the fill costs and it is fair that they can see it.

Whole-house teardown before a rebuild

One record from the first walk-through to the last load out, holding the scope, the dates, the photos and every message the builder sent you.

Plaster and lath strip-out in an older home

Scoped by the room, with the dust control and the haul-away priced as their own lines rather than buried in an hourly number.

Concrete driveway break-out and haul-away

Bin rental and tipping sit right beside the machine and operator, so a heavy load never turns into an argument at the end of the job.

Deck and shed removal before the snow

The half-day work that fills the gaps between the big jobs, booked at your price without a phone call and dropped into the day that suits the truck.

Commercial tenant improvement demo

Nights and weekends for a property manager who wants it done by Monday. Dates, access notes and sign-off all live on the booking, not in a thread.

A list of quotes showing whether each is sent, viewed or accepted, and when it was last opened.
Quotes5 awaiting reply
  • Émilie TremblayBooked just now$215Accepted
  • Ryan MacLeodOpened 2h ago$480Viewed
  • The Oak CaféSent yesterday$120Sent

The quote that went quiet in March.

Demolition quotes sit for months while an owner waits on approval. See which have been opened and which never were, so the one worth a call on Friday is obvious.

A list of bookings with the week's totals, each job showing the customer, suburb, service, time, price and a status dot.
This week56 jobs
Booked value$19,820
  • Mason King · The BeachesEmergency call-out · Wed · 3:30pm$180
  • Ava Baker · RoncesvallesCallout +1 · Wed · 1:00pm$560
  • Grace Walker · TorontoRepair visit · Wed · 11:30am$120
  • Amelia Ryan · The BeachesSecond visit · Tue · 2:00pm$190

Everything on, and what it is worth.

The strip-outs, the knockdowns and the half-day clears in one list, with the week's total under them. It answers the only question worth asking on a Sunday night.

A bathroom strip-out priced instantly from the job details.
New bookingAvailable
ServiceBathroom strip-out
WhereGround floor · The Beaches
DateWed 20 Aug · 8:00am
Priced instantly$780

The strip-out already has a price.

The jobs you do every week carry a set price, so the builder books a real gap without a call while you are still sitting on a machine.

One inbox holding customer messages, team messages and Bookables notices, with unread threads marked.
AllCustomersTeamSystem
  • RMRyan MacLeod2mCan you come Thursday instead?
  • BBookables1hA booking request needs your answer
  • PSPriya Sandhu3hRunning 10 late on the Parkdale job

The photos and the paperwork on the job.

Messages from the builder, shots of the sheeting and the report you were sent all hang off the booking, so the crew and the office read the same file.

A timeline of a customer's past jobs, quotes and payments.
Émilie Tremblay14 jobs
  • 19 AugGarage knockdownBooked · $3,650
  • 11 AugBathroom strip-outPaid · $780
  • 30 JulDriveway break-outAccepted · $2,180
  • 9 JulShed removal & clearCompleted · $1,240

The builder who books you monthly.

Every site you have pulled apart for them, what it came to and what is still open, on one card instead of in last year's diary.

When the power is still on Monday.

Demo dates slip because somebody else ran late: the disconnect, the report, the bins. Move the job on the board and nobody has to call around.

  • Drag it to the week that works

    Pick the job up and drop it where the machine is genuinely free. Your customer gets the new date without you making the call.

  • Your crew read the same board

    Whoever is on that site sees it change, so nobody floats a machine to an address that got pushed two weeks.

  • Free on every plan

    Moving work around your day and your week costs nothing. It is not the part we charge for and it never will be.

A day on the schedule where one job is dragged from one time to a later one and snaps into place on the grid.
Wednesday1 Jul
Drag to reschedule
08:00
09:00
10:00
11:00
12:00
13:00
14:00
08:00 · Riverdale
Tap & toilet repair
Parkdale
Hot water repair
Pro

Paid to mobilize, paid at clean-up.

A float, a machine and two labourers cost money before a wall comes down. Record the e-transfer by hand for free, or send a card link on Pro.

  • Cash and e-transfer are free

    Mark it paid the moment the transfer lands. Recording money by hand is free on any plan and it always will be.

  • Cards come with Pro

    Send a card link once the job is booked. The money goes straight to your account — we never hold your money for you.

  • Split it across the job

    Ask for part before you mobilize and the rest once the site is clean. Staged requests come with Pro and go out after the job is booked.

A list of payments, each with the customer, reference, date, method and amount, with totals received and still outstanding.
Received$4,310
Outstanding$3,840
  • Émilie TremblayP-1011 · 25 Jun · Bank transfer$380
  • Ryan MacLeodP-1012 · 25 Jun · Cash$240
  • Priya SandhuP-1013 · 28 Jun · Card$380
  • Jacob WongP-1001 · 27 Jun · Card$190

How far the float is worth towing.

A machine on a float has a radius that makes sense, and past it the job stops paying. Draw what you cover and your page holds that line for you.

  • Your area, your call

    Draw the area around your yard. An address outside it hears back on the spot instead of a week after they asked.

  • Two yards, two areas

    Running equipment out of a second yard? Each yard keeps its own area and the jobs fall to the right one.

  • One rate right across it

    Inside your area your price is your price. Bookables never quietly adds anything on for a longer haul.

A map with three service areas shaded over a street grid, and a list of territories beneath, each a group of regions with its crew.
  • Roncesvalles8 regions · 2 crew
  • Riverdale7 regions · 2 crew
  • Toronto North7 regions · 2 crew

Starts free. Grows
only when you do.

Add your whole team and get booking for nothing.
As you grow with us you can go Pro.

Free

$0

No credit card required

Free every month

200 bookings
every month, free
Get started free

Pro

$2/ booking

Grow without limits

Pay as you go

Unlimited bookings
only $2 when you get booked
Go Pro
Explore plans→

One app for the whole job

Everything you need to run your demolition business.

Scheduling

Walk-throughs, demo days and the haul-away all sit on one board, so your operator knows exactly which address the machine goes to Tuesday morning.

Bookings

One record per job, from the first walk-through through the teardown and the bins to the day the site is swept and handed back over.

Online booking

Basement guts and deck removals book at your set price. A teardown lands as a request instead, because that job gets walked before it gets a number.

Inbox

Your builder’s messages, the photos of the old siding and the estimate you sent sit on the job instead of spread across two phones and a text thread.

Estimates

Estimate the way you price it: machine and operator, bins and tipping, clean-up and grading, each on its own line with the total sitting underneath.

Customers

Renovators hire you a dozen times a year. Their addresses, their rates and every tear-out you have done for them all sit on the one card.

Territories

Set how far the float is worth towing. A job past your range should never book itself in and then cost your crew a day on the highway.

Team

Add your operator, your labourers and the office, give each of them the job list they need, and keep the money screens for the people who should see them.

Payments

Cash and e-transfer you record by hand are free on any plan. Card links come with Pro, the money lands in your account, and we never hold it.

Common questions.

They can book the walk-through, and your set jobs — a basement gut, a deck removal — can be booked outright at your price. A teardown comes in as a request with the address and their dates, so you never quote one you have not stood on.

No. Bookables runs the job — scope, dates, messages and money — while the report and the permit stay where they already live. Attach them to the booking so your crew and your office are reading the same file on the same day.

Yes, once the job is booked. Send a payment request to cover mobilization and a second when the site is clean. Cash and e-transfer you record by hand are free on every plan; card links come with Pro and go out after the booking, not at checkout.

Drag the job to the day your machine is actually free. Your homeowner gets the new date, your crew see the same board, and the estimate, photos and messages stay right on the job instead of being rebuilt from text messages.

Yes. Draw the area the float is worth towing and anything outside it hears back right away instead of a week later. Inside your area your rate holds, and nothing is quietly added on for a longer haul.

Yes. Add your operator, your labourers and whoever runs the office, give each of them the job list they need, and keep the money screens for the people who should be in them.

Related industries

All Trades
Plumbing

Plumbing

Handyman

Handyman

Painting & Decorating

Painting & Decorating

Heating & Gas

Heating & Gas

Air Conditioning

Air Conditioning

Carpentry & Joinery

Carpentry & Joinery

Get Booked.

More time to service, less on admin.

Start with Email

Demolition guides

All articles

Sep 9, 2026

Online booking vs phone booking: which one actually gets the job booked?

Compare online and phone bookings for service businesses, with a practical way to handle standard jobs, tricky enquiries and customers who prefer a call.

Read

Sep 6, 2026

Fully booked? How to keep the lead without promising the impossible

Handle enquiries when your diary is full with clear requests, alternative times and a practical manual waiting list that avoids double bookings.

Read

Sep 2, 2026

Booking deposits: enough to make it real, not a hostage negotiation

Choose booking deposits that fit your work, explain the balance and cancellation terms, and understand how deposits differ from refundable security bonds.

Read

Product

  • Overview
  • Pricing
  • Updates
  • Help

Company

  • About
  • Blog
  • Contact

Legal

  • Terms
  • Privacy
  • Cookies

Get started

  • Sign Up
  • Log In

© 2026

Bookables.
Pricing