
From the first look at a recladding job to the day the last bay comes off the wrap and the hire stops running.
Online booking
You cannot price a reclad off a photo of the front of the house. Put the site visit on your page and quote once you have walked the boundary.
Learn moreSmart scheduling
Every scaffold is an erect, a stretch of hire and a strip. Book the erect and the strip together so the dismantle is on the board from day one.
Learn moreNeed a full wrap on a two-storey in Grey Lynn for the renderers. Anything free before the end of the month?
Scaffolding runs out of stock long before it runs out of hours. When there is nothing free the page says so and still takes the enquiry.
A scaffold stands for weeks, so the dismantle is a date you set while you are quoting rather than something you hope somebody remembers in March.
Three ways to quote it: access scaffold to the affected elevations, full wrap to the roofline, or that plus shrink wrap and a hardstand for sheets.
Bays, lifts, wrap and hire weeks are separate lines, so when the number gets questioned you can point at the part it came from.
Add the wrap or another four weeks and the total moves with it. No sums on the bonnet, no figure you have to correct later.
The quote goes out while you are still parked outside, which tends to be before the next crew has returned the call.
Pro: sell the extras as options with their own prices. Shrink wrap, extra hire weeks, a loading bay, mesh instead of netting. The quoted total moves as the builder picks, without you rewriting a thing.
Where it is, what is going up, what it costs and when it comes down, all attached to the job before the truck is loaded.
Every site you have wrapped for them, what you charged and what is still standing, on one card instead of in last year's notebook.
A scaffold quote sits with three others on a builder's phone. See what has been read and what has been signed, so the one worth a call is obvious.
Built for your trade
Full-height scaffold with shrink wrap for a leaky building fix, quoted with a realistic hire period because these jobs always run long.
Edge protection for a re-roof, on the board the day before the roofers start and stripped the day after, both dates set when you quote.
Access to a two-storey weatherboard for the painters, priced by elevation with the hire weeks stated so nobody argues in week six.
Scaffold following the build up the lifts, with each raise booked as its own visit rather than remembered by whoever answered the phone.
Towers out by the day or the week, with the collection date sitting on the job so the yard knows what is still out there.
The awkward small one with a hard tie-in, quoted after a look rather than off a text, because photos never show the ground level.
A short scaffold to a deck rebuild over sloping ground, priced with the extra base work it always needs on a section like that.
A working deck across a hall or a shop floor, priced on the area and usually put in over a weekend while the place is closed.
The build slips, the scaffold stays. Extra weeks go on the open job and get invoiced from it, so hire billed matches hire stood.
The strip booked as its own visit with its own crew, because the gang that erected it is on the other side of town by then.
Two payments on every job and neither should need chasing. Record what lands in the bank for nothing, or take cards on Pro.
Mark it paid when the transfer shows up. That costs nothing on any plan.
Send a card link for the erect, and another for the hire weeks the build ran over by.
Part on erect, the rest on strip. Staged requests come with Pro and go out once the job is booked.
A load of gear has a sensible radius and past it the job stops paying for itself. Set what you cover and the page holds the line.
Draw the patch around the yard. Anything outside hears about it straight away, not a week later.
Gear out of two sheds means two areas, and jobs land with the shed that can actually service them.
The rate is the rate anywhere in your area. Nothing is quietly added for a longer drive.
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
One app for the whole job
Yes. Every person on your team has their own record, so you can note who holds Elementary, Intermediate or Advanced. Bookables does not check or issue anything, and sending the right ticket to the right job stays your judgement.
The job stays open while the scaffold stands. Add hire weeks to it as the build drags on and invoice them from the same record, so what you billed and what actually stood on site never come apart.
No. You price it, from the elevations, the lift heights, the wrap and the hire period. Bookables keeps the quote, the erect date, the strip date and the payments on one job instead of across a notebook and two phones.
Yes. Quoting, scheduling, the booking page, your customer list and the inbox cost nothing, with a generous monthly allowance most residential outfits never reach. Card payments and the automatic parts sit on Pro.
No, and it does not pretend to. It holds the job rather than the register: the address, the dates it went up and came down, your notes and the photos you took, all on the one record you can find later.
Your customers, quotes and job history export whenever you want them. Nothing is held hostage, which is easier to say when the free plan already does the work most crews need.
Compare online and phone bookings for service businesses, with a practical way to handle standard jobs, tricky enquiries and customers who prefer a call.
ReadHandle enquiries when your diary is full with clear requests, alternative times and a practical manual waiting list that avoids double bookings.
ReadChoose booking deposits that fit your work, explain the balance and cancellation terms, and understand how deposits differ from refundable security bonds.
Read