
Schist cladding, a bowing greywacke wall, a chimney that needs strengthening: from the first site measure through to the day it is pointed up.
Online booking
Your page shows the days you can get out and takes the address with the booking, so the first proper conversation happens at the wall.
Learn moreSmart scheduling
What is being cut and what is being laid sit on the same schedule. Move the fix when the stone is held up and the crew and the customer move with it.
Learn moreThe sandstone fence out the front is bowing badly at the corner. Can it be rebuilt with the old blocks?
Stone work books out further than most trades. When the page has nothing left, the owner can still tell you what they want.
Nobody should be able to buy a stone wall from a page. What your page hands out is the twenty minutes with a tape, which is the only honest thing to sell before you have seen the ground and the access.
What you matched, what the mortar was and which elevation you did last time stay on the address, so the call about the next crack does not start with you trying to remember a mix from four years ago.
Dry-stacked, mortared with a raked joint, or full-bed with hand-dressed quoins are three quite different jobs on the same run of wall.
Square metres, linear metres and hours go on as lines, so changing the stone moves one number rather than the whole document.
A quote covering the house wall and the garden steps carries both addresses, so which day each gets done is never a guess.
Quote numbers are set once behind a confirm and never quietly change, which matters when two versions end up side by side.
Pro turns those into option groups: joint finish, capping, a sealing upgrade. Each carries its own price movement, so the total updates as they choose instead of waiting on you to write it out again.
It happens most months. Shifting the fixing day should take one drag, not four calls and a rubbed-out whiteboard in the shed.
Pick the booking up, drop it on Thursday. The crew, the address and the notes travel with it on any plan.
The new date goes out from the record, so nobody drives out to a locked gate on the strength of the old one.
Cutting and fixing are separate bookings on the same job, so pushing one does not leave the other stranded on its own.
Measure, cut and fix are three days in two places, and treating them as one entry is how a saw day quietly disappears. Each is its own booking under the same job, with the same customer, the same stone and the same notes.
A headstone or a whole elevation is not decided in an afternoon. Sent, opened and accepted each show on the quote, so the follow-up call goes to the person who read it twice rather than to everybody.
Built for stone
Quoted by the square metre off the elevation you measured, with corners on their own line because that is where the hours go.
Priced on face area and height. Change the height and the metres redraw themselves rather than needing the whole quote rebuilt.
Soft stone, slow work. Price the indents as units and the dressing as hours, so the owner can see which part is the real money.
A job with an engineer, a scaffold and a weather window. Keep all three dates on the one record instead of on three text threads.
Site measure, shop day and install day are three bookings on one job, so the saw and the site never end up on the same morning.
Square metres of paving, linear metres of edging. Two lines, two drivers, and no argument later about what was included.
Raking out and repointing prices by the hour or the metre. Pick the driver you can defend when the owner asks how you got there.
One measure, one template, one fix. Good, better and best stone choices sit as options on the same quote instead of three documents.
Quiet work with a hard date. Inscription wording, the cemetery paperwork and the fixing day live on one record so nothing is asked twice.
Short jobs with long lead times. Book the fix against the delivery week and the customer hears the date once, not weekly.
A trailer of schist changes what a long drive means. Coverage areas draw the line once so you stop repeating the same conversation.
Towns in, towns out. Beyond the line the page stops the booking rather than putting it on your Tuesday.
Memorial work may travel further than the walling crew. Areas are set per service, not once for the whole business.
There is no drive-time loading here and we will not invent one. The line is where you go, not what you add on top.
Two site measures on the same side of the harbour on the same morning beats a tidy-looking calendar. Pro scores open slots on the driving they add.
Nothing already booked gets moved. The open slots are ordered by how much extra driving each one would cost you.
Twenty minutes at the wall and an hour on the road each way. Grouping those is where the week is actually won.
The ranking sits beside the slots as a suggestion. Take the second one if the owner is only home on a Friday.
Most of what a mason is paid still moves as a transfer, and that has never cost anything here. Cards are the part that comes with Pro.
Mark it paid on any plan. We are not taking a cut of a bank transfer you organised yourself.
Send a link and it clears while the crew is tidying up, rather than a month after the last stone went in.
Split the job across the stone order and the fix. Stages go out once the booking exists, never as a charge to hold a site measure.
One app for the whole job
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
There is no stonemason licence, and Bookables does not pretend to check one. What does bite is dust: WorkSafe sets a workplace exposure standard for respirable crystalline silica and has an accelerated silicosis alert out for the stone benchtop trade. Keep your control measures in the booking notes so the crew reads them on the day, not in a folder.
They book the site measure, not the wall. You turn up, get the real square metres and the access, and the quote follows. A schist wall booked sight unseen is a job you end up doing at a loss, so the page is set up to take the visit instead.
No. Cash and bank transfer recorded by hand are free on every plan, which covers most of what a mason gets paid. Cards come with Pro if you would rather the balance cleared before you left the site. The plan cards on this page carry the numbers.
Yes. Split the job so the stone order and the fixing are separate stages, and send them once the booking exists. Staged payments come with Pro. No money is ever taken at online checkout, so booking a site measure never costs the customer anything.
Draw your coverage area over the suburbs and towns you actually get to. Anything outside stops before it becomes a booking, which saves the awkward call about a two hour drive each way with a trailer of stone behind you.
Yes. Owner, Manager and Staff are separate roles. Staff see the day, the address and the notes for the job. Rates, margins and what the stone cost stay with the Owner.
Compare online and phone bookings for service businesses, with a practical way to handle standard jobs, tricky enquiries and customers who prefer a call.
ReadHandle enquiries when your diary is full with clear requests, alternative times and a practical manual waiting list that avoids double bookings.
ReadChoose booking deposits that fit your work, explain the balance and cancellation terms, and understand how deposits differ from refundable security bonds.
Read