
The survey, the quote, the fitting days and the money in one place, from the first call about a worn stair carpet to the last length of beading.
Online booking
Customers pick a survey slot off your page. They say which rooms and what they are after, so the van is loaded for LVT or gripper rods.
Learn moreSmart scheduling
A latex screed that has to cure is not an empty morning. Book it as its own block and no fitting crew stands in a hallway waiting on a soft floor.
Learn moreThe job that comes up more than any other, and the one where the entry range, the good wool and the top end side by side does the selling.
Pro adds option groups with their own price deltas, so a thicker underlay, moving the furniture and taking the old carpet away each shift the figure the customer is reading.
Enter the square metres and the figure follows, rather than working it out on the back of a receipt outside.
Carpet, LVT and engineered oak side by side, so the choosing is theirs rather than something you explain twice.
Underlay grade, uplift and disposal, moving furniture. Each shows what it adds, so nothing surfaces later as news.
The old vinyl comes up and what is underneath needs levelling before a thing goes down. The week has to move.
Push the afternoon job across to Thursday on the calendar and that is the whole of it. No plan needed.
Message from the same job record, so what you said sits with the booking rather than in your own phone.
Everything behind it moves along too, so the running order is not held solely in your head.
The measure, the levelling visit with the days it needs to dry, the laying and the money that followed it. Kept together at the address, so when they ring about a lifted board three years on you are reading it back rather than remembering it.
Built for your trade
Priced by area off the survey, with the stairs and landing on their own line so the fitting day is not a negotiation.
Longer than a plain lay and priced as its own service, so the day allowed matches the pattern rather than the area.
Consecutive days with coats between, booked so the household knows which evenings they are off the floor entirely.
A survey visit to check the floor and the commissioning, then the fitting days, because the order is not optional.
Quoted by area, booked for a weekend when the floor is clear, with lifting and replacing the desks as an option.
Welded vinyl with coved skirting, quoted by area and fitted in sections so the corridor is never fully shut.
Sold by the flight rather than the metre, with rods and nosings as options so the quote matches what they picked.
A single fitting day the letting agent books online, with uplift of the old carpet ticked on as it always is.
Its own visit with its own curing time, kept clear of the fitting day so nobody lays onto something still soft.
Strip out, drying period and refit booked as three visits, so the loss adjuster can see the order at a glance.
A living room in laminate or hybrid is the same job every time, so it can carry its own price and land in the gap on its own. The whole-house work still starts with a measure-up, because nobody prices four rooms and a stair flight off a phone call.
Every measure ends in a document, and the ones that go quiet all look identical from your side. Seeing which was read this morning and which was never opened is the difference between a follow-up and a nuisance.
Flooring runs in seasons and the good stretch has nothing left in it. A page with no slots quietly sends people to the next fitter.
Shown plainly, which is honest and rather often sooner than the customer had assumed.
If nothing suits, they leave the rooms and the floor they want, and you ring when a job falls through.
Only genuinely free days are offered, so two crews never arrive at the same address on the same morning.
Lounge, hall and two bedrooms, and the stairs if you do them. Old carpet needs taking away. How far out are you?
A van full of carpet rolls does not go everywhere. Draw the line once and the booking page holds it for you.
A postcode outside the patch cannot book itself in. It asks instead, and you answer with the diary open.
The contract fitters take the city, the domestic pair take the villages, and neither turns up at the wrong job.
The area decides whether you go, never what it costs. A longer drive is a decision, not a line on the quote.
Most fitting balances arrive as a transfer the evening you finish. That has always been free here, and cards suit the customer who would sooner tap.
Record what came in and the job is closed. No plan required, and nothing taken off work already done.
For the customer stood in a bare hallway with a phone, wanting it settled before you drive away.
Ask for the materials money once the job is booked, and the rest when the last bead of beading goes on.
One app for the whole job
Add your whole team and get booking for nothing.
As you grow with us you can go Pro.
Yes. Floor area is one of the pricing drivers, so the survey measurement prices the job. Stairs and landings sold by the room work the same way, and the two can sit happily on one quote.
Set it up as an option on the service with its own price. Tick it where the old carpet and underlay are going, leave it off where the builder has already cleared it, and the quote adjusts itself.
Book the preparation as its own visit with the curing time it needs, ahead of the fitting days. It keeps the crew off a floor that is not ready and gives the customer a reason for the gap in the middle.
They are, with their own durations and options. Sanding and finishing pine floorboards in a Victorian terrace runs days with coats in between; a carpet fit runs one. Nothing forces them into the same slot length.
No, and that is deliberate. The National Institute of Carpet and Floorlayers and the Contract Flooring Association hold what you are signed up to. This handles the booking, the quote and the payment, and leaves your credentials where they belong.
Cash and bank transfer that you record yourself are free on every plan, which covers most fitting balances. Card payments come with Pro, for the customer who would rather tap before you load the van.
Compare online and phone bookings for service businesses, with a practical way to handle standard jobs, tricky enquiries and customers who prefer a call.
ReadHandle enquiries when your diary is full with clear requests, alternative times and a practical manual waiting list that avoids double bookings.
ReadChoose booking deposits that fit your work, explain the balance and cancellation terms, and understand how deposits differ from refundable security bonds.
Read