• Pricing
A floorlayer laying a timber floor in the UK

Booking software for carpet fitters and floorlayers in the UK.

The survey, the quote, the fitting days and the money in one place, from the first call about a worn stair carpet to the last length of beading.

Try it
or
Start with Google
200 bookings a month, free. No credit card required.
  • Slots ranked by least added driving
  • Every fit holds its true hours
  • Whole-house quotes signed online
  • Payment requests before the offcuts are loaded

Online booking

Surveys booked without the evening phone call

Customers pick a survey slot off your page. They say which rooms and what they are after, so the van is loaded for LVT or gripper rods.

Learn more
A single-room hybrid fit priced instantly from the room size.
New bookingAvailable
ServiceHybrid floor fit
WhereLiving room · Chorlton
DateTue 18 Aug · 8:00am
Priced instantly£720

Smart scheduling

Screeds and coats get days of their own

A latex screed that has to cure is not an empty morning. Book it as its own block and no fitting crew stands in a hallway waiting on a soft floor.

Learn more
bookables.ai/schedule
A day on the schedule's calendar, with three jobs placed on a vertical time grid at the times they run.
Wednesday1 Jul
3 jobs
08:00
09:00
10:00
11:00
12:00
13:00
14:00
08:00 · Didsbury
Laminate room fit
10:00 · Chorlton
Carpet fit
12:30 · Ancoats
Hybrid floor fit

Supply and fit carpet through a three-bed semi.

The job that comes up more than any other, and the one where the entry range, the good wool and the top end side by side does the selling.

  • Three floors on one page, with Pro

    Pro adds option groups with their own price deltas, so a thicker underlay, moving the furniture and taking the old carpet away each shift the figure the customer is reading.

  • The survey does the arithmetic

    Enter the square metres and the figure follows, rather than working it out on the back of a receipt outside.

  • Three floors on one page

    Carpet, LVT and engineered oak side by side, so the choosing is theirs rather than something you explain twice.

  • The extras are not buried

    Underlay grade, uplift and disposal, moving furniture. Each shows what it adds, so nothing surfaces later as news.

A whole-house hybrid quote, itemised and ready to send.
Estimate #1042
Gemma Whitfield
Sent
  • Hybrid flooring · 65 sqmSupply£2,600
  • Lift & dispose old carpetLabour£450
  • Install & trim2 days£2,150
Total£5,200

When the subfloor is worse than described.

The old vinyl comes up and what is underneath needs levelling before a thing goes down. The week has to move.

  • Drag it rather than rebook it

    Push the afternoon job across to Thursday on the calendar and that is the whole of it. No plan needed.

  • They hear it from you

    Message from the same job record, so what you said sits with the booking rather than in your own phone.

  • The rest still adds up

    Everything behind it moves along too, so the running order is not held solely in your head.

Three crew members on one timeline, each with their jobs laid out across the working day so gaps are easy to spot.
TeamWednesday 1 Jul
3 on today
08:0010:0012:0014:0016:00
APAisha
ValeRoweKerr
LDLiam
BevanHartNair
SMSophie
ShawOduya
A timeline of a customer's past jobs, quotes and payments.
58 Wilmslow Road, Didsbury, Manchester M20 2SP4 records
  • 14 AugPayment received£3,880
  • 12 AugCarpet through a three-bed semiCompleted · £3,880
  • 8 AugLatex screed over an uneven floorCompleted · 2 days to dry
  • 29 JulCarpet through a three-bed semi quoteAccepted · £3,880

One floor is four records at one address.

The measure, the levelling visit with the days it needs to dry, the laying and the money that followed it. Kept together at the address, so when they ring about a lifted board three years on you are reading it back rather than remembering it.

Built for your trade

Built for every kind of flooring work

Carpet through a three-bed semi

Priced by area off the survey, with the stairs and landing on their own line so the fitting day is not a negotiation.

LVT laid in herringbone

Longer than a plain lay and priced as its own service, so the day allowed matches the pattern rather than the area.

Sanding pine floorboards in a terrace

Consecutive days with coats between, booked so the household knows which evenings they are off the floor entirely.

Engineered oak over underfloor heating

A survey visit to check the floor and the commissioning, then the fitting days, because the order is not optional.

Carpet tiles in an office

Quoted by area, booked for a weekend when the floor is clear, with lifting and replacing the desks as an option.

Safety flooring in a care home

Welded vinyl with coved skirting, quoted by area and fitted in sections so the corridor is never fully shut.

Stair runner with rods

Sold by the flight rather than the metre, with rods and nosings as options so the quote matches what they picked.

Laminate between tenancies

A single fitting day the letting agent books online, with uplift of the old carpet ticked on as it always is.

Latex screed over an uneven floor

Its own visit with its own curing time, kept clear of the fitting day so nobody lays onto something still soft.

Reflooring after an escape of water

Strip out, drying period and refit booked as three visits, so the loss adjuster can see the order at a glance.

A single-room hybrid fit priced instantly from the room size.
New bookingAvailable
ServiceHybrid floor fit
WhereLiving room · Chorlton
DateTue 18 Aug · 8:00am
Priced instantly£720

The one-room fit books itself off the room size.

A living room in laminate or hybrid is the same job every time, so it can carry its own price and land in the gap on its own. The whole-house work still starts with a measure-up, because nobody prices four rooms and a stair flight off a phone call.

A list of quotes showing whether each is sent, viewed or accepted, and when it was last opened.
Quotes5 awaiting reply
  • Gemma WhitfieldBooked just now£215Accepted
  • Danny OkoroOpened 2h ago£480Viewed
  • The Oak CaféSent yesterday£120Sent

Three quotes out and only one of them opened.

Every measure ends in a document, and the ones that go quiet all look identical from your side. Seeing which was read this morning and which was never opened is the difference between a follow-up and a nuisance.

Booked up a month out, and still worth asking.

Flooring runs in seasons and the good stretch has nothing left in it. A page with no slots quietly sends people to the next fitter.

  • The first day you can actually fit

    Shown plainly, which is honest and rather often sooner than the customer had assumed.

  • An enquiry rather than a bounce

    If nothing suits, they leave the rooms and the floor they want, and you ring when a job falls through.

  • Nothing booked twice

    Only genuinely free days are offered, so two crews never arrive at the same address on the same morning.

A booking request inside a message thread, answered with accept or decline without leaving the conversation.
DODanny Okoro

Lounge, hall and two bedrooms, and the stairs if you do them. Old carpet needs taking away. How far out are you?

Booking request
Carpet through a three-bed semi
Thu 11 Sep · 8:00am · Didsbury
AcceptDecline

The postcodes you genuinely cover.

A van full of carpet rolls does not go everywhere. Draw the line once and the booking page holds it for you.

  • Settled before it is booked

    A postcode outside the patch cannot book itself in. It asks instead, and you answer with the diary open.

  • Two crews, two patches

    The contract fitters take the city, the domestic pair take the villages, and neither turns up at the wrong job.

  • The price does not move

    The area decides whether you go, never what it costs. A longer drive is a decision, not a line on the quote.

A map with three service areas shaded over a street grid, and a list of territories beneath, each a group of counties with its crew.
  • Ancoats8 counties · 2 crew
  • Prestwich7 counties · 2 crew
  • Manchester North7 counties · 2 crew

Money that rather sees itself out.

Most fitting balances arrive as a transfer the evening you finish. That has always been free here, and cards suit the customer who would sooner tap.

  • Cash and transfer are free

    Record what came in and the job is closed. No plan required, and nothing taken off work already done.

  • Cards come with Pro

    For the customer stood in a bare hallway with a phone, wanting it settled before you drive away.

  • Staged payments on Pro

    Ask for the materials money once the job is booked, and the rest when the last bead of beading goes on.

A list of payments, each with the customer, reference, date, method and amount, with totals received and still outstanding.
Received£4,310
Outstanding£3,840
  • Gemma WhitfieldP-1011 · 25 Jun · Bank transfer£380
  • Danny OkoroP-1012 · 25 Jun · Cash£240
  • Aisha PatelP-1013 · 28 Jun · Card£380
  • Liam DochertyP-1001 · 27 Jun · Card£190

One app for the whole job

Everything you need to run your flooring business.

Scheduling

Fitting days, sanding days and the time a screed needs to cure all sit on one calendar, so nothing lands on a floor still going off.

Bookings

Each job carries the rooms, the floor going down and the survey measure, so the van is loaded before anyone turns a key.

Online booking

Customers choose a survey slot themselves and say what rooms and what floor, which is most of the first call gone already.

Inbox

The enquiry, the quote chase and the photo of the skirting all sit in one thread against that job rather than in three apps.

Estimates

Priced by the square metre off the survey, with underlay, uplift and furniture moving as lines the customer can weigh up.

Customers

Every floor you have fitted for them sits on one record, so the recoat call years on starts with what the boards actually are.

Territories

Set out the postcodes you fit in and the ones you do not, so a job the far side of the county asks before it books.

Team

Give each fitter the floors they genuinely lay, and their fitting days appear on the same calendar without a morning ring round.

Payments

Cash and bank transfer you record by hand are free on any plan. Cards come with Pro, for the balance before you load the van.

Starts free. Grows
only when you do.

Add your whole team and get booking for nothing.
As you grow with us you can go Pro.

Free

£0

No credit card required

Free every month

200 bookings
every month, free
Get started free

Pro

£1/ booking

Grow without limits

Pay as you go

Unlimited bookings
only £1 when you get booked
Go Pro
Explore plans→

Common questions.

Yes. Floor area is one of the pricing drivers, so the survey measurement prices the job. Stairs and landings sold by the room work the same way, and the two can sit happily on one quote.

Set it up as an option on the service with its own price. Tick it where the old carpet and underlay are going, leave it off where the builder has already cleared it, and the quote adjusts itself.

Book the preparation as its own visit with the curing time it needs, ahead of the fitting days. It keeps the crew off a floor that is not ready and gives the customer a reason for the gap in the middle.

They are, with their own durations and options. Sanding and finishing pine floorboards in a Victorian terrace runs days with coats in between; a carpet fit runs one. Nothing forces them into the same slot length.

No, and that is deliberate. The National Institute of Carpet and Floorlayers and the Contract Flooring Association hold what you are signed up to. This handles the booking, the quote and the payment, and leaves your credentials where they belong.

Cash and bank transfer that you record yourself are free on every plan, which covers most fitting balances. Card payments come with Pro, for the customer who would rather tap before you load the van.

Related industries

All Trades
Plumbing

Plumbing

Electrical

Electrical

Handyman

Handyman

Painting & Decorating

Painting & Decorating

Heating & Gas

Heating & Gas

Air Conditioning

Air Conditioning

Get Booked.

More time to service, less on admin.

Start with Email

Flooring guides

All articles

9 Sept 2026

Online booking vs phone booking: which one actually gets the job booked?

Compare online and phone bookings for service businesses, with a practical way to handle standard jobs, tricky enquiries and customers who prefer a call.

Read

6 Sept 2026

Fully booked? How to keep the lead without promising the impossible

Handle enquiries when your diary is full with clear requests, alternative times and a practical manual waiting list that avoids double bookings.

Read

2 Sept 2026

Booking deposits: enough to make it real, not a hostage negotiation

Choose booking deposits that fit your work, explain the balance and cancellation terms, and understand how deposits differ from refundable security bonds.

Read

Product

  • Overview
  • Pricing
  • Updates
  • Help

Company

  • About
  • Blog
  • Contact

Legal

  • Terms
  • Privacy
  • Cookies

Get started

  • Sign Up
  • Log In

© 2026

Bookables.
Pricing