• Pricing
An excavator cutting a footing trench on a site in the UK

Booking software for groundworks contractors in the UK.

Price the dig once you have walked the plot, have it signed before the machine moves, and keep the operators, the grab lorries and the wet weeks on one board.

Try it
or
Start with Google
200 bookings a month, free. No credit card required.
  • Site walks booked while you are still in the seat
  • Two machine sizes priced side by side on one quote
  • Signed quotes become booked machine days
  • Move a wet dig and the crew moves with it
  • Free, up to 200 bookings a month

Online booking

Site visits booked while you are in the cab

Main contractors rarely ring twice. Your own page takes the plot address and the scope, and puts the visit in the diary at nine in the evening.

Learn more
A driveway cut and fill priced instantly from the job details.
New bookingAvailable
ServiceDriveway cut & fill
WhereFront block · Chorlton
DateTue 19 Aug · 7:00am
Priced instantly£1,180

Smart scheduling

Machines, operators and low-loaders on one week

Every machine, every plot and every move in one view, so the morning the three-tonne is expected on two plots is one you notice first.

Learn more
bookables.ai/schedule
A day on the schedule's calendar, with three jobs placed on a vertical time grid at the times they run.
Wednesday1 Jul
3 jobs
08:00
09:00
10:00
11:00
12:00
13:00
14:00
08:00 · Didsbury
Footing trench dig
10:30 · Chorlton
Driveway cut & fill
12:30 · Ancoats
Retaining wall prep

Nobody answers the phone from an excavator cab.

You spend the day in ear defenders with a bucket in your hands, which is precisely when contractors ring. Those who leave no message ring elsewhere.

  • The enquiry waits; the contractor would not have

    A page that takes the plot address and the scope means the job is still there at five, written down, rather than a missed number you cannot place.

  • A visit, not the works

    What gets booked online is the site visit. The figure is still yours to write once you have seen the ground, which is the only honest way this trade prices.

A booking request inside a message thread, answered with accept or decline without leaving the conversation.
SMSophie Marsh

Need a price on the site cut and the footings. There is a fair bit of fill across the back of it.

Booking request
Site walk
Tue 12 Aug · 7:00am · Ancoats
AcceptDecline

One plot, two machines, two figures.

The contractor wants to know if the dig is a week or a fortnight. Put both machines on one page with the muckaway under each, and let them choose.

  • Two machines on one quote, with Pro

    Machine size, rock and whether the spoil stays on the plot are option groups, so ticking muckaway moves the total on screen while the contractor is reading it. Options on a quote come with Pro.

  • Machine days do the arithmetic

    Set the days against the machine rate and the quote adds up the same on the tailgate as it would at the desk at eight that evening.

  • Muckaway sits on its own line

    Loads and tip charges apart from the digging, which is what stops one figure being read as the cost of the excavator.

  • The quote keeps its number

    Document numbering is set once and does not shift, so the quote that was signed and the invoice that follows point at one another.

A new-build site cut quote, itemised and ready to send.
Estimate #1042
Gemma Whitfield
Sent
  • Machine float on & off siteMobilisation£680
  • Bulk cut · 5t excavator2 days£3,400
  • Cart away spoil · 8 loadsTip fees£1,760
Total£5,840

The quote a builder is sitting on.

A dig is priced against two or three others and nobody rings to say so. Knowing yours was opened twice on Thursday is the difference between a follow-up and a nag.

  • Sent, viewed, accepted

    Every quote says which of the three it is and when it was last opened, so the ones worth a call on Friday are obvious.

  • Accepted becomes machine days

    The moment it is signed it converts into a booking, so nobody re-types a site cut into the calendar at nine at night.

  • An expiry, because tip charges move

    Put a date on the quote and a rate you wrote before the wet season cannot be held against you after it.

A list of quotes showing whether each is sent, viewed or accepted, and when it was last opened.
Quotes5 awaiting reply
  • Gemma WhitfieldBooked just now£215Accepted
  • Danny OkoroOpened 2h ago£480Viewed
  • The Oak CaféSent yesterday£120Sent

Every dig you take on

Built for site cuts, footings and everything trenched around them

Strip and trench fill footings

Priced in machine days after the visit, with the depth and the concrete note on the job, and booked the day it is signed.

Site strip and reduced dig

Quoted with the muckaway underneath it, so the contractor can see the lorries separately from the machine.

Foul and surface water drainage runs

Priced per run with the chambers and the backfill as their own lines, which is what keeps a variation civil.

Oversite and sub-base

Area and days do the arithmetic, so the figure on the tailgate matches the one you would have written at the desk.

Muckaway and tipping

Loads and tip charges itemised apart from the digging, because that is the line that gets queried first.

Driveway and hardstanding dig

The smaller works that pay for the move, slotted between the plots and visible to the whole crew.

Attenuation crates and soakaways

Its own package with an expiry on it, since a rate written in autumn should not be held against you in spring.

Service trenches for the utilities

Booked with honest durations so the jointer is not stood at a half-dug trench on a Tuesday morning.

Weather reshuffles

A saturated Monday dragged to the next dry day, taking the operator and the lorry with it rather than the fortnight.

One inbox holding customer messages, team messages and Bookables notices, with unread threads marked.
AllCustomersTeamSystem
  • DODanny Okoro2mCan you come Thursday instead?
  • BBookables1hA booking request needs your answer
  • APAisha Patel3hRunning 10 late on the Sale job

Everything you need before the bucket goes in.

The utility plans, the drainage layout, the levels and the builder's programme all arrive in different places and end up on a phone. Kept in one thread against the job, they are still there on the morning of the dig.

A timeline of a customer's past jobs, quotes and payments.
Danny OkoroBuilder · 4 sites
  • MarSite cut and level3 machine days
  • JunFootings and service trenchQuote accepted
  • JunPaid in fullBank transfer

The builder you dug three sites for.

Repeat work is most of this trade, and the second job always starts with someone trying to remember what you charged for the first. Every quote, dig and payment stays on the one record.

Three crew members on one timeline, each with their jobs laid out across the working day so gaps are easy to spot.
TeamWednesday 1 Jul
3 on today
08:0010:0012:0014:0016:00
APAisha
ValeRoweKerr
LDLiam
BevanHartNair
SMSophie
ShawOduya

One week, every operator and every machine on it.

A dig runs long, an operator is on a second site by Wednesday, and the truck is booked against both. Laid out on one timeline, the day that does not add up is visible on Friday instead of at seven on Monday morning.

A wet week that moves in one piece.

Clay has no interest in the programme. When the plot is under water the dig moves, and with it the lorry, the operator and the bricklayers behind you.

  • Drag the dig; the crew comes with it

    Everything attached to that job moves at once, which is rather better than four calls made from a lay-by.

  • The crew watch it change

    The new start reaches their phones straight away, so nobody drives an hour to a plot stood down the night before.

  • Free on every plan

    Moving work around the week costs nothing. Automating what fills the gap is the part that sits on Pro.

A day on the schedule where one job is dragged from one time to a later one and snaps into place on the grid.
Wednesday1 Jul
Drag to reschedule
08:00
09:00
10:00
11:00
12:00
13:00
14:00
08:00 · Prestwich
Tap & toilet repair
Sale
Hot water repair

The plots a low-loader will actually reach.

A machine costs money to move before it turns a bucket, and the further out the plot the more of the week the move takes. Draw the line once.

  • Draw it rather than describe it

    Towns and shapes on a map, not a paragraph on a contact page nobody reads before they book.

  • Beyond the line, they can still ask

    Works past the boundary arrive as an enquiry rather than a booking, so the big one up the A-road remains yours to accept.

A map with three service areas shaded over a street grid, and a list of territories beneath, each a group of counties with its crew.
  • Ancoats8 counties · 2 crew
  • Prestwich7 counties · 2 crew
  • Manchester North7 counties · 2 crew
Pro

Settled before the machine leaves the plot.

Main contractors pay on their terms rather than yours, and every week it sits unpaid is another week the tip charges sat on your card.

  • Cash and transfer are free

    Record what has landed against the job on any plan. Nothing about the free plan stops you being paid for a dig.

  • Cards come with Pro

    Send the link while the plot is still being raked off and watch it clear, rather than posting an invoice into a site cabin.

  • Staged, where the works earn it

    The move and the completed dig can each carry a payment request on Pro. They sit after the booking, never at the point a date is picked.

A list of payments, each with the customer, reference, date, method and amount, with totals received and still outstanding.
Received£4,310
Outstanding£3,840
  • Gemma WhitfieldP-1011 · 25 Jun · Bank transfer£380
  • Danny OkoroP-1012 · 25 Jun · Cash£240
  • Aisha PatelP-1013 · 28 Jun · Card£380
  • Liam DochertyP-1001 · 27 Jun · Card£190

One app for the whole job

Everything you need to run your groundworks business.

Scheduling

Machine days, the low-loader move and the follow-on trade sit on one week, so a rained-off dig drags across with its operator attached.

Bookings

Every site strip, footing run and drainage job in one list, carrying the plot address, the machine it needs and the days you priced.

Online booking

Your own page, where a contractor books the site visit overnight with the plot address and the rough scope already attached to it.

Inbox

The LSBUD results, the drainage layout and the contractor chasing a start date sit in one thread against the job, not in your phone.

Estimates

Itemise the move, the machine days and the muckaway separately, set two machine sizes side by side, and let them sign it off online.

Customers

The contractor you dug three plots for last year keeps every quote, job and payment on one record, with the rates and tips on it.

Territories

Draw the areas a machine will travel to, so works two counties away cannot quietly book themselves in without you looking first.

Team

Operators, the groundworkers and the lorry driver all read the same start, so nobody moves a machine to a plot stood down last night.

Payments

Cash and transfer recorded by hand on any plan. Cards come with Pro, so the dig is settled before the machine is back on the trailer.

Starts free. Grows
only when you do.

Add your whole team and get booking for nothing.
As you grow with us you can go Pro.

Free

£0

No credit card required

Free every month

200 bookings
every month, free
Get started free

Pro

£1/ booking

Grow without limits

Pay as you go

Unlimited bookings
only £1 when you get booked
Go Pro
Explore plans→

Common questions.

You are not, and this does not pretend otherwise. The online page books the site visit rather than the works: plot address, rough scope, a date. You walk the ground, build the quote from machine days, muckaway and the low-loader, and send it from the same job.

Price it before you find it. Rock, made ground and a second machine can each sit on the quote as an option the contractor ticks, so the figure moves while they are reading it rather than in a call from site. Options on a quote come with Pro.

No. LinesearchbeforeUdig is free, you submit it yourself, and it only returns the asset owners registered with it, so the rest of the enquiries are still yours to make. What Bookables does is hold the results that come back, the drainage layout and the contractor’s programme in one thread against that job, so on the morning of the dig nobody is trawling an inbox for a PDF from three weeks ago.

Drag the dig to the next workable day. The operator, the grab lorry and the move go with it, and the crew have the new start on their phones before you have put yours down. Shifting work around the week costs nothing on any plan.

Draw the areas a machine will travel to and the booking page holds that line. Anything beyond it still arrives as an enquiry, so the one that is worth the low-loader remains a decision rather than something you missed.

Not at all. Cash and bank transfer are recorded by hand on any plan and cost nothing. Cards come with Pro, as do staged payment requests, which go out after the booking exists rather than at the moment somebody picks a date.

Related industries

All Trades
Plumbing

Plumbing

Electrical

Electrical

Handyman

Handyman

Painting & Decorating

Painting & Decorating

Heating & Gas

Heating & Gas

Air Conditioning

Air Conditioning

Get Booked.

More time to service, less on admin.

Start with Email

Excavation & Earthmoving guides

All articles

9 Sept 2026

Online booking vs phone booking: which one actually gets the job booked?

Compare online and phone bookings for service businesses, with a practical way to handle standard jobs, tricky enquiries and customers who prefer a call.

Read

6 Sept 2026

Fully booked? How to keep the lead without promising the impossible

Handle enquiries when your diary is full with clear requests, alternative times and a practical manual waiting list that avoids double bookings.

Read

2 Sept 2026

Booking deposits: enough to make it real, not a hostage negotiation

Choose booking deposits that fit your work, explain the balance and cancellation terms, and understand how deposits differ from refundable security bonds.

Read

Product

  • Overview
  • Pricing
  • Updates
  • Help

Company

  • About
  • Blog
  • Contact

Legal

  • Terms
  • Privacy
  • Cookies

Get started

  • Sign Up
  • Log In

© 2026

Bookables.
Pricing